Earned Value Health Check in Plain English
Prompt
Budget at completion (BAC): {{BUDGET_AT_COMPLETION}}
Planned value to date (PV): {{PLANNED_VALUE}}
Earned value to date (EV, the budgeted cost of work actually completed) and how it was measured: {{EARNED_VALUE}}
Actual cost to date (AC): {{ACTUAL_COST}}
Calculate, and show the working for: schedule variance SV = EV − PV; cost variance CV = EV − AC; SPI = EV / PV; CPI = EV / AC; estimate at completion EAC = BAC / CPI; estimate to complete ETC = EAC − AC; variance at completion VAC = BAC − EAC; and TCPI = (BAC − EV) / (BAC − AC).
Then:
1. A four-sentence readout for a sponsor: ahead or behind, over or under budget, and what happens if current performance continues.
2. Two caveats about these numbers, based on how EV was measured. Guessed "percent complete" figures, for example, tend to inflate EV.
3. Three questions to investigate before reporting the result.
Rules: use only my numbers and currency. If a figure is missing, skip that calculation and say what's needed. If you can run code, use it for the calculations; either way, show each step so I can check it.
Customize this prompt
Fill in the variables below to personalize this prompt:
Model Settings
Recommended Models
Temperature
Max Tokens
Additional Notes
About this prompt
“Earned Value Health Check in Plain English” is a free prompt for ChatGPT in the Reasoning & Problem-Solving category, 212 words long, added to The Prompt Index on October 28, 2026 by The Prompt Index. Copy it with the button above, paste it into ChatGPT or any other AI chat assistant, and send it.
It has 4 placeholders to fill in first:
{{BUDGET_AT_COMPLETION}}, {{PLANNED_VALUE}}, {{EARNED_VALUE}}, {{ACTUAL_COST}}.
Use the “Customize this prompt” fields to personalise it before you copy.
Recommended models: ChatGPT, Claude, Gemini.
0 upvotes, sent to an AI tool 0 times, viewed 21 times.
Browse all Reasoning & Problem-Solving prompts, the AI prompt database or use the AI prompt finder to search every prompt.