By role · Free prompt pack

ChatGPT, Claude & Gemini Prompts for Project Managers

50 free project management prompts for ChatGPT, Claude and Gemini: charters, WBS, RAID logs, status reports, minutes, sprints, change requests.

Prompts
50
Works with
ChatGPT, Claude & Gemini
Updated
Price
Free to copy

Most lists of ChatGPT prompts for project managers are one-line requests for tips: "give me strategies for managing scope creep", "create a status report template". That isn't where the time goes. A project manager's week is spent processing real material: messy meeting notes, a sponsor's half-formed brief, three different estimates for the same task, a change request that arrived on Friday afternoon. These 50 prompts work on that material, across eight sections that follow a project from charter to closure. Agile and Waterfall are both covered properly.

Each prompt gives the AI a role, asks for your specifics through {{VARIABLES}}, sets the rules an experienced PM would set, and specifies the output: a RACI, a RAID log, a register row, minutes with owners, a status report with RAG ratings or a change board summary. They work the same in ChatGPT, Claude and Gemini.

Two rules run through the whole pack. First, the AI never invents your numbers. Estimates, dates and budgets come from you and your team. The PERT, critical path, earned value, capacity and velocity prompts apply standard formulas to your figures and show their working. Second, gaps are flagged, not filled. A missing owner comes back as [OWNER?], a missing target as [TARGET NEEDED], and a forecast later than the baseline can't be reported Green. Four prompts include a worked example so you can see the output before you paste.

Charters, Scope & Kickoff

Most project trouble starts before the plan exists, with a vague request, an unsigned scope or two people who both think they're accountable. These prompts turn a sponsor's brief into a charter, pin scope down with explicit exclusions and testable acceptance criteria, and question a vague request before you commit to anything. They also map stakeholders, settle ownership with a RACI and plan a kickoff that ends with named owners. None of them invents dates, budgets or targets; gaps come back marked in brackets.

Project Charter From a Sponsor's Brief

Best for: Turning a sponsor's informal ask into a charter they can sign

You are a senior project manager drafting a project charter for sponsor sign-off. Work only from the material below.

Sponsor's brief or request: {{SPONSOR_BRIEF}}
Business reason and the problem it solves: {{BUSINESS_CASE}}
Known constraints (deadline, budget ceiling, people, technology, regulation): {{CONSTRAINTS}}
Delivery approach (Waterfall, Agile, hybrid or undecided): {{DELIVERY_APPROACH}}

Write the charter under these headings: Purpose; Objectives (specific and measurable, using only targets I gave; where a target is missing write [TARGET NEEDED: what to measure]); High-level scope, in and out; Key deliverables; Milestones (dates only if I supplied them); Budget (my figure or [NOT PROVIDED]); Assumptions; Constraints; Top 5 initial risks; Roles (sponsor, project manager, key stakeholders, who holds decision authority); Approval block.

Rules:
- Never invent dates, costs, headcount or targets. Mark every gap in square brackets.
- Keep it to two pages, in plain language a sponsor can read in five minutes.
- If the approach is Agile, express scope as outcomes and a product goal rather than a fixed feature list, and say how scope decisions will be made.

After the charter, list the five questions I most need the sponsor to answer before signing.

Fill in: SPONSOR_BRIEF BUSINESS_CASE CONSTRAINTS DELIVERY_APPROACH

Use at the very start, when all you have is an email or a conversation with the sponsor. Send the charter and the five questions together.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Scope Statement With Exclusions and Acceptance Criteria

Best for: Locking down scope boundaries before work or estimates start

Act as a project manager who has been burned by vague scope before. Turn the notes below into a scope statement a client or sponsor can sign.

Project summary: {{PROJECT_SUMMARY}}
What the requester says they want: {{REQUESTED_FEATURES}}
What I already know is excluded or deferred: {{KNOWN_EXCLUSIONS}}
Who signs off the deliverables: {{APPROVER}}

Produce:
1. Scope description (one paragraph).
2. Deliverables table: deliverable | description | acceptance criteria (testable, yes/no) | approver.
3. Out of scope: an explicit list. Add items people commonly assume are included in this kind of project (for example training, data migration, content creation, support after go-live) and mark each "Confirm excluded?".
4. Assumptions the scope depends on, each with what happens if it proves false.
5. Ambiguity list: every word in the request that two reasonable people could read differently ("integrate", "mobile-friendly", "reports"), each with a question that pins it down.

Rules: don't add features I didn't mention to the in-scope list. Don't estimate effort or cost. Write acceptance criteria someone could check without asking me what I meant.

Fill in: PROJECT_SUMMARY REQUESTED_FEATURES KNOWN_EXCLUSIONS APPROVER

Run this before any planning or estimating. The out-of-scope list and the ambiguity questions are the parts that prevent later disputes.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Interrogate a Vague Project Request

Best for: Getting from a one-line request to a plannable problem

Act as a senior business analyst at intake. Someone has asked for a project and I don't yet know enough to plan it.

The request, exactly as I received it: {{RAW_REQUEST}}
Who is asking, and their role: {{REQUESTER}}
What I already know about context, systems or deadlines: {{KNOWN_CONTEXT}}

Don't plan the project and don't propose a solution yet. Instead:
1. Restate the request in one sentence as a problem to solve, not a solution to build.
2. List what is unknown, grouped as: outcome and success measures, users, scope boundaries, constraints (time, budget, people), dependencies, risks, and who decides.
3. Write the 10 clarifying questions that would most change the plan, ranked. For each, say in one line why it matters.
4. Flag any part of the request that sounds like a fixed solution ("we need an app") and give a neutral question that explores the underlying need.
5. Say whether this looks like a small piece of work, a project or a program, and what the answer depends on.

Keep the tone curious and respectful. These questions will go to a busy person, so make each one answerable in a sentence.

Fill in: RAW_REQUEST REQUESTER KNOWN_CONTEXT

Paste the request word for word, even if it's a one-line chat message. Send the top five questions first if the requester is senior and short on time.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Stakeholder Map and Engagement Plan

Best for: Deciding who to engage, how and when, before a key decision

You are a program manager planning stakeholder engagement. Use only the people and facts I provide.

Project: {{PROJECT_SUMMARY}}
Stakeholders (name or role, what they care about, how they feel about the project if known): {{STAKEHOLDER_LIST}}
Decisions coming up in the next three months: {{UPCOMING_DECISIONS}}

Produce:
1. A power/interest table: stakeholder | influence (high/low) | interest (high/low) | current stance (supporter, neutral, skeptic, blocker or unknown) | desired stance | evidence for the rating (from my notes, or "assumed").
2. For each stakeholder: what they need to hear, the risk if they're ignored, the best channel, how often, and which team member owns the relationship.
3. The three stakeholders whose stance matters most to the upcoming decisions, with a specific next action for each this week.
4. Gaps: groups often forgotten on projects like this (end users, operations, legal, procurement, security, finance) that are missing from my list, framed as questions.

Rules: never state someone's motives as fact; label any inference "assumption". Keep the language neutral, because stakeholder maps get forwarded. No personality labels.

Fill in: PROJECT_SUMMARY STAKEHOLDER_LIST UPCOMING_DECISIONS

Revisit this before each major decision point, not just at kickoff. Store the output somewhere private: even neutral stance ratings can upset people.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

RACI Matrix That Settles Ownership

Best for: Ending 'I thought you were doing that' with one accountable owner per activity

Act as a PMO lead who builds RACI charts that settle arguments instead of starting them.

Deliverables or activities: {{ACTIVITIES}}
People or roles on the project: {{ROLES}}
Known decision rights or organizational rules (who must approve what): {{DECISION_RULES}}

Build a RACI matrix with activities as rows and roles as columns, using R (does the work), A (accountable; exactly one per row), C (consulted before), I (informed after).

Rules:
- Exactly one A per row. If my inputs suggest two people are accountable, put [CONFLICT] in that row and explain it below the table.
- Don't assign anyone to work I haven't connected them to. Where a role is unclear, mark it "?" rather than guessing.
- Flag overload: any role with R on more than half of the rows, and any row with more than three Cs, because that slows decisions.
- Flag gaps: rows with no R, and roles with no letters at all.

After the table, give:
1. A list of conflicts and gaps, each with the question I should ask to resolve it.
2. A three-sentence explanation of how to read the RACI, which I can paste into the kickoff deck.

Fill in: ACTIVITIES ROLES DECISION_RULES

List activities at the level people argue about (sign-offs, approvals, hand-offs), not every task. Review the conflicts with the sponsor before publishing.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Kickoff Meeting Plan, Talking Points and Pre-Read

Best for: A kickoff that ends with agreement and owners, not just slides

You are an experienced delivery lead preparing a project kickoff. The goal is shared understanding and named owners, not a slideshow.

Project charter or summary: {{CHARTER_SUMMARY}}
Attendees and their roles: {{ATTENDEES}}
Meeting length and format (in person, remote, hybrid): {{MEETING_FORMAT}}
The thing most likely to go wrong in this meeting (a skeptical stakeholder, unclear scope, a team that was told late): {{KICKOFF_CONCERN}}

Produce:
1. A timed agenda that fits the meeting length exactly, with an owner and an outcome for each item. Cover: why the project exists, scope in and out, how we'll work (cadence, tools, approach), roles, top risks and agreed next steps.
2. Talking points for each agenda item, as bullets rather than a script.
3. Five questions to put to the room that surface hidden disagreement early.
4. A plan for handling the concern I named, including what to say if it comes up.
5. A short pre-read email to send 48 hours ahead.

Rules: use only facts from my summary. If the timings don't fit, cut items and tell me which to move to a follow-up rather than squeezing them in.

Fill in: CHARTER_SUMMARY ATTENDEES MEETING_FORMAT KICKOFF_CONCERN

Run this after the charter is signed. Name the real concern honestly in KICKOFF_CONCERN; that's where most of the value comes from.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

WBS, Estimates & Schedule Control

Chat models are good at structure and arithmetic and bad at knowing how long your work takes, so these prompts split the job accordingly. The WBS prompt decomposes scope without guessing durations. The PERT, critical path, capacity and earned value prompts take your team's numbers, apply the standard formulas and show every step so you can check them. There is also a stage-gate milestone plan for Waterfall projects and a recovery prompt for when the schedule has already slipped.

Work Breakdown Structure and WBS Dictionary

Best for: Breaking scope into estimable work packages without guessed numbers

You are a project scheduler building a work breakdown structure (WBS). Decompose only what I have described.

Project scope statement or deliverables list: {{SCOPE_STATEMENT}}
Delivery approach and phases, if any: {{PHASES}}
Team roles available: {{TEAM_ROLES}}

Produce:
1. A deliverable-oriented WBS to three levels, numbered 1.0, 1.1, 1.1.1. Level 1 is major deliverables or phases; level 3 is work packages. Include project management as its own branch.
2. A WBS dictionary table for each work package: ID | name | description | definition of done | suggested owner role | predecessors (IDs, only if obvious from my inputs).
3. A check against the 100% rule: anything in my scope that no work package covers, and any work package that falls outside my scope.

Rules:
- No durations, effort or costs. Estimates come later, from the people doing the work.
- Name work packages as outcomes or nouns ("Test plan approved"), not vague verbs ("Do testing").
- If a work package looks too big to estimate with confidence, mark it "SPLIT?" and suggest how.
- List any assumptions you had to make to decompose a deliverable.

Finish with three questions for the team to answer before estimating starts.

Fill in: SCOPE_STATEMENT PHASES TEAM_ROLES

Paste your signed scope statement. Take the work packages to the team for estimates; the PERT prompt below combines their numbers.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Three-Point PERT Estimates From Your Team's Ranges

Best for: Combining team estimates into an honest duration range

Act as a project estimator. Combine my team's estimates; never replace them with your own numbers.

Tasks with optimistic (O), most likely (M) and pessimistic (P) estimates, in the units given: {{TASK_ESTIMATES}}
Which tasks run in sequence and which in parallel: {{TASK_SEQUENCE}}
Working days per week and any known non-working days: {{CALENDAR_NOTES}}

For each task, calculate the PERT expected duration E = (O + 4M + P) / 6 and the standard deviation SD = (P − O) / 6. For the longest sequential chain, sum E and combine the SDs as the square root of the sum of the squared SDs.

Output:
1. A table: task | O | M | P | E | SD.
2. The chain total, its combined SD, and the ranges total ± 1 SD and total + 2 SD, labeled as rough planning ranges rather than probabilities to rely on.
3. The three tasks contributing the most uncertainty, with a question to ask each estimator.
4. Inconsistent estimates (O above M, P below M, or a very wide range), flagged, not corrected.

Rules: use only my numbers. If a task is missing a value, mark it and exclude it from the totals. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: TASK_ESTIMATES TASK_SEQUENCE CALENDAR_NOTES

Collect O/M/P from the people doing the work, not from the AI. Quote the range to stakeholders, never the single expected figure on its own.

Run in ChatGPT Run in Claude Run in Gemini Prompt page
Example output · Claude (example written by The Prompt Index)
Sample inputs: TASK_ESTIMATES = A Requirements workshops O3 M5 P10; B Data migration scripts O8 M12 P25; C User acceptance testing O5 M8 P15; D Training materials O4 M6 P9; E Cutover rehearsal O1 M2 P (not given). All in working days. TASK_SEQUENCE = A then B then C then E; D runs in parallel with C. CALENDAR_NOTES = 5-day weeks, no holidays in the period.

1. Estimates
| Task | O | M | P | E = (O+4M+P)/6 | SD = (P−O)/6 |
|---|---|---|---|---|---|
| A Requirements workshops | 3 | 5 | 10 | (3+20+10)/6 = 5.50 | 7/6 = 1.17 |
| B Data migration scripts | 8 | 12 | 25 | (8+48+25)/6 = 13.50 | 17/6 = 2.83 |
| C User acceptance testing | 5 | 8 | 15 | (5+32+15)/6 = 8.67 | 10/6 = 1.67 |
| D Training materials | 4 | 6 | 9 | (4+24+9)/6 = 6.17 | 5/6 = 0.83 |
| E Cutover rehearsal | 1 | 2 | MISSING | excluded | excluded |

2. Chain total (A → B → C; E excluded, D is parallel and shorter than C)
- Expected total: 5.50 + 13.50 + 8.67 = 27.67 working days.
- Combined SD: √(1.17² + 2.83² + 1.67²) = √(1.361 + 8.028 + 2.778) = √12.167 = 3.49 days.
- Total ± 1 SD: 24.2 to 31.2 working days (roughly 5 to 6 weeks).
- Total + 2 SD: 34.6 working days (about 7 weeks).
These are rough planning ranges, not probabilities to rely on. They also exclude E until it has a pessimistic estimate.

D (6.17 days) runs alongside C (8.67 days), so it adds nothing to the chain unless it slips by more than about 2.5 days.

3. Biggest sources of uncertainty
- B Data migration scripts (SD 2.83): "What would have to happen for this to take 25 days? Is that about data quality in the source system?"
- C User acceptance testing (SD 1.67): "Does the 15-day case assume a second test cycle? How many defects would trigger one?"
- A Requirements workshops (SD 1.17): "Is the 10-day case driven by stakeholder availability? Can we book the sessions now?"

4. Flags
- B: the pessimistic estimate is more than three times the optimistic one. That is a very wide range worth discussing, but I haven't changed it.
- E: the pessimistic value is missing, so E is excluded from the totals. Add it to complete the chain.
- No task has O above M or P below M.

Critical Path From Your Task List

Best for: Finding which tasks actually drive the end date

You are a scheduler checking a plan's critical path. Use only the tasks, durations and dependencies I give you.

Task list with durations and predecessors (finish-to-start unless I say otherwise): {{TASK_NETWORK}}
Project start date and working calendar: {{START_AND_CALENDAR}}
Fixed deadlines or milestone dates: {{DEADLINES}}

Do this:
1. Run a forward pass (earliest start and finish) and a backward pass (latest start and finish). Show the working as a table: task | duration | ES | EF | LS | LF | total float.
2. Identify the critical path (zero float) and its total duration. If there are several, list each.
3. Compare the finish with my deadlines and state the gap in working days, positive or negative.
4. Name near-critical tasks (float of two days or less) that could easily become critical.
5. Flag network problems: tasks with no predecessor or no successor other than the start and end, circular dependencies, and missing durations.

Rules: never add tasks or change durations. Convert working days to calendar dates only with the calendar I gave you. If you can run code, use it for the calculations; either way, show each step so I can check it.

Finish with one sentence I can tell the sponsor about where the schedule risk sits.

Fill in: TASK_NETWORK START_AND_CALENDAR DEADLINES

Export the task list from your scheduling tool as plain text (ID, name, duration, predecessors). Use it to sanity-check the tool or a plan built in a spreadsheet.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Stage-Gate Milestone Plan for a Waterfall Project

Best for: A milestone plan with real gate criteria, not just dates

Act as a project manager in an organization that uses stage gates. Build a milestone plan the steering group can approve.

Project phases and their main deliverables: {{PHASE_DELIVERABLES}}
Dates already fixed (contractual, regulatory, launch events): {{FIXED_DATES}}
Our governance: who approves each gate and how often they meet: {{GOVERNANCE}}

Produce:
1. A milestone table: milestone | phase | definition of done (the evidence that proves it) | gate approver | target date (only dates I gave you; otherwise [DATE TBD]).
2. Gate criteria for each stage: four to six questions the approver should be able to answer yes to before work moves on.
3. Where the governance calendar could delay a gate (for example, a board that meets monthly), with a suggested workaround such as a pre-booked slot or delegated approval.
4. A one-paragraph summary to put at the top of the plan.

Rules: milestones are zero-duration events, not activities. Write them as completed states ("Design signed off"), not tasks ("Design work"). Don't invent dates or durations. If a gate has no clear approver in my inputs, say so. Where a phase has no deliverable that proves it is finished, flag the phase and suggest what evidence would.

Fill in: PHASE_DELIVERABLES FIXED_DATES GOVERNANCE

Use for regulated, contract-driven or construction-style projects. Check the governance calendar early; a missed board date can cost a month.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Team Capacity Check Against the Plan

Best for: Spotting overloaded people before the plan breaks

You are a resource manager checking whether a plan is realistic for the people available. Use only my numbers.

Team members, roles and availability (hours per week on this project, holidays, other commitments): {{TEAM_AVAILABILITY}}
Planned work by person or role, with effort estimates and dates: {{PLANNED_WORK}}
Period to check: {{CHECK_PERIOD}}

Do this:
1. Calculate available hours per person per week for the period, after holidays and other commitments.
2. Calculate planned hours per person per week from the plan.
3. Show a table: person | week | available | planned | load (planned divided by available). Mark loads over 1.0 as OVERLOADED and under 0.5 as UNDERUSED.
4. List the overloaded weeks and give options for each: move the work, reassign it to a named person with spare capacity and the right skills, split the task, or move the date. Say what each option costs.
5. Note any single-person dependency, where only one person can do a type of work.

Rules: don't assume every hour is productive. If I haven't said how much time goes to meetings and support, say that you used my availability figures as given. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: TEAM_AVAILABILITY PLANNED_WORK CHECK_PERIOD

Run it before you commit dates, and again whenever someone is pulled onto another project. Give availability for project work only, not contracted hours.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Recover a Slipping Schedule: Fast-Track, Crash or Cut

Best for: Giving the sponsor real recovery options when a deadline is at risk

Act as a recovery project manager. The schedule has slipped and I need options, not optimism.

Current plan status (tasks remaining, durations, dependencies, owners): {{REMAINING_PLAN}}
The deadline at risk and how much time we need to recover: {{DEADLINE_GAP}}
What I can change (budget, extra people, overtime, scope, quality steps) and what is off-limits: {{LEVERS_AVAILABLE}}

Produce four options:
A. Fast-tracking: which sequential tasks could overlap, and the rework risk that creates.
B. Crashing: where extra people or money would shorten the critical path. Note tasks where adding people late would slow things down.
C. Scope: which deliverables could be cut, deferred to a later release or simplified, and the effect on the objectives.
D. Re-baseline: what a credible new date looks like if nothing else changes, based only on my remaining durations.

For each option give: time recovered (only from my numbers; otherwise "needs estimate"), cost, risk, and who must approve it.

End with a recommended combination and a five-line message to the sponsor presenting the choice.

Rules: never present an option that depends on people simply working faster. Don't hide quality cuts, such as less testing, inside another option; list them separately and name the risk.

Fill in: REMAINING_PLAN DEADLINE_GAP LEVERS_AVAILABLE

Use as soon as the forecast crosses the deadline, not the week before. Paste only the remaining work, with durations from the people doing it.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Earned Value Health Check in Plain English

Best for: Turning EV, PV and AC into a sponsor-ready readout

You are a project controls analyst. Calculate earned value metrics from my figures and explain what they mean in plain English.

Budget at completion (BAC): {{BUDGET_AT_COMPLETION}}
Planned value to date (PV): {{PLANNED_VALUE}}
Earned value to date (EV, the budgeted cost of work actually completed) and how it was measured: {{EARNED_VALUE}}
Actual cost to date (AC): {{ACTUAL_COST}}

Calculate, and show the working for: schedule variance SV = EV − PV; cost variance CV = EV − AC; SPI = EV / PV; CPI = EV / AC; estimate at completion EAC = BAC / CPI; estimate to complete ETC = EAC − AC; variance at completion VAC = BAC − EAC; and TCPI = (BAC − EV) / (BAC − AC).

Then:
1. A four-sentence readout for a sponsor: ahead or behind, over or under budget, and what happens if current performance continues.
2. Two caveats about these numbers, based on how EV was measured. Guessed "percent complete" figures, for example, tend to inflate EV.
3. Three questions to investigate before reporting the result.

Rules: use only my numbers and currency. If a figure is missing, skip that calculation and say what's needed. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: BUDGET_AT_COMPLETION PLANNED_VALUE EARNED_VALUE ACTUAL_COST

Use your finance figures for AC and a consistent EV method (such as 0/50/100 per work package). Report CPI and SPI trends over several periods, not one snapshot.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Risks, RAID Logs, Dependencies & Suppliers

A risk register is only useful if it's current and specific. These prompts surface risks with a pre-mortem, write register rows in cause-event-effect form on your own scoring scale, and build a RAID log from the notes you already have. They also stress-test the assumptions your plan rests on, track dependencies on other teams, review a supplier against its contract, and write an escalation note that asks for a decision, not sympathy. Scores the AI suggests are marked as proposals for the team to confirm.

Pre-Mortem: Imagine the Project Has Failed

Best for: Finding the risks nobody wants to say out loud

Act as a facilitator running a pre-mortem. Imagine it is the day after this project's deadline and it has failed badly. Work backwards from that failure.

Project summary, objectives and deadline: {{PROJECT_SUMMARY}}
Plan highlights, team and key dependencies: {{PLAN_HIGHLIGHTS}}
Things that already worry me: {{CURRENT_WORRIES}}

Produce:
1. Twelve distinct failure stories, two sentences each, spread across: requirements and scope, people and skills, suppliers and dependencies, technology, stakeholders and politics, schedule and estimates, and adoption after go-live. Each must connect to something in my inputs and be specific to this project, not generic advice.
2. For each story, the early warning sign we would see first, and roughly when in the project.
3. The four stories that look most plausible given my inputs, each with one preventive action that is cheap to take now.
4. Questions to ask the team in a 45-minute pre-mortem session to surface failures I haven't thought of.

Rules: don't reassure me. Don't assign probabilities or scores; this step is for discovery, and scoring happens later in the risk register. Avoid vague risks like "poor communication" unless you say exactly what communication fails, and between whom.

Fill in: PROJECT_SUMMARY PLAN_HIGHLIGHTS CURRENT_WORRIES

Run it before the plan is baselined, then do the real session with the team. Feed the plausible stories into the risk register prompt.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Risk Register Entries Scored on Your Own Scale

Best for: Turning worries into cause-event-effect register rows

You are a risk manager writing entries for a project risk register. Turn my rough risk notes into well-formed entries.

Rough risk notes: {{RISK_NOTES}}
Our probability and impact scale, with definitions: {{SCORING_SCALE}}
Escalation threshold or risk appetite: {{ESCALATION_THRESHOLD}}
Possible owners on the team: {{RISK_OWNERS}}

For each risk, write a register row: ID | risk statement in the form "Because of [cause], [event] may occur, which would lead to [effect on objectives]" | category | probability | impact | score (as my scale defines it) | proximity (when it could happen) | response type (avoid, mitigate, transfer or accept; exploit or enhance for opportunities) | response actions | trigger | owner | status.

Rules:
- Separate risks (uncertain future events) from issues (already happening). Move issues to a separate list.
- Score only with my scale. Where my notes don't support a rating, suggest one and mark it "PROPOSED: confirm with team".
- Assign owners only from my list; otherwise write [OWNER?].
- Put any risk above my escalation threshold at the top, flagged.
- Merge duplicates and tell me which ones you merged.

End with the three risks whose response actions should start this week.

Fill in: RISK_NOTES SCORING_SCALE ESCALATION_THRESHOLD RISK_OWNERS

Paste your organization's scale so scores match the rest of the portfolio. Review proposed scores with the team; don't let the AI's rating stand unchecked.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

RAID Log From Messy Meeting Notes

Best for: Keeping a RAID log current without retyping everything

Act as a PMO analyst cleaning up a RAID log. I'll paste notes from meetings, emails and chats. Sort every relevant item into Risks, Assumptions, Issues and Dependencies.

Pasted notes: {{RAW_NOTES}}
Project name and current phase: {{PROJECT_PHASE}}
Existing RAID log, if any, so you update it instead of duplicating: {{EXISTING_RAID}}

Output four tables:
- Risks: ID | description | owner | next review date | status
- Assumptions: ID | assumption | how and by when we'll validate it | what happens if it's wrong
- Issues: ID | description | impact now | owner | action | due date
- Dependencies: ID | what we depend on, or what depends on us | other team or supplier | needed by | status

Rules:
- Use only what's in the notes. Owners and dates come from the notes; where they're missing write [OWNER?] or [DATE?].
- Quote the source line briefly for each item so I can trace it.
- If an item could fit two categories, put it in the more likely one and note the alternative, e.g. "(could be an issue)".
- Mark items that update the existing log UPDATED, with what changed. Mark new items NEW.

End with a list of items that need a decision from me this week.

Fill in: RAW_NOTES PROJECT_PHASE EXISTING_RAID

Paste a week's worth of notes at once. Remove names of people outside the project and anything commercially confidential before pasting.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Issue Escalation Note That Gets a Decision

Best for: Escalating upward with options and a clear ask

You are a project manager escalating an issue that's beyond your authority to resolve. The note must get a decision, not sympathy.

The issue and what's happened so far: {{ISSUE_DETAILS}}
Impact on scope, schedule, cost or quality (my figures only): {{ISSUE_IMPACT}}
Options I can see, including doing nothing: {{OPTIONS_CONSIDERED}}
Who I'm escalating to, and when I need an answer: {{DECISION_MAKER_AND_DEADLINE}}

Write an escalation note of no more than 300 words with:
1. A subject line that states the decision needed and the date.
2. Decision required: one sentence.
3. Background: three sentences, facts only.
4. Impact if we don't decide by the date.
5. Options table: option | cost | what it fixes | risk.
6. My recommendation and why.
7. What I've already tried within my own authority.

Rules: neutral tone, with no blame and no names of people at fault. Don't soften the impact. Don't introduce numbers I didn't give you; write [FIGURE NEEDED] instead.

After the note, list anything the recipient is likely to ask that the note doesn't yet answer, so I can add it before sending.

Fill in: ISSUE_DETAILS ISSUE_IMPACT OPTIONS_CONSIDERED DECISION_MAKER_AND_DEADLINE

Use when an issue needs someone above you to decide or fund something. Send it before the deadline becomes an emergency.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Stress-Test the Plan's Assumptions

Best for: Exposing the unstated assumptions a plan depends on

Act as a skeptical reviewer on a project assurance team. Find the assumptions this plan relies on and test them.

Plan summary or excerpt: {{PLAN_EXCERPT}}
Estimates, dates or budget figures the plan relies on: {{KEY_FIGURES}}
Context about the organization and past similar projects: {{ORG_CONTEXT}}

Do this:
1. List every assumption the plan makes, stated or unstated: people will be available, a supplier will deliver, users will adopt, the data is clean, approvals take a week. Mark each one stated or unstated.
2. For each, rate how much the plan depends on it (high, medium, low) and how much evidence supports it, using only my inputs: evidence given, partial, or none.
3. Pick the five riskiest (high dependence, little evidence). For each, describe what breaks if it's false and a cheap way to test it in the next two weeks.
4. Write those five as entries ready for the assumptions log: assumption | owner role | validation test | validate by.

Rules: don't recalculate or replace my figures; question them. Don't use outside benchmarks or industry statistics. If the plan is too thin to assess, list the extra information you need instead of guessing.

Fill in: PLAN_EXCERPT KEY_FIGURES ORG_CONTEXT

Run it on your own plan before a gate review or a funding decision. It's quicker to find these yourself than to have an assurance reviewer find them.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Cross-Team Dependency Map and Chase Messages

Best for: Keeping dependencies on other teams visible and moving

Act as a delivery manager on a project that depends on other teams who don't report to me. Map the dependencies and help me chase them without burning goodwill.

Dependencies as I understand them (what we need, from whom, by when, and what they need from us): {{DEPENDENCY_LIST}}
Our milestones and which work each dependency feeds: {{MILESTONE_LINKS}}
What I know about each team's priorities and current workload: {{OTHER_TEAM_CONTEXT}}

Produce:
1. A dependency table: ID | direction (we need / they need) | item | providing team and contact role | needed-by date | milestone it feeds | slack before it hurts (only if my dates show it) | status | confidence (confirmed in writing, verbal, or assumed).
2. The dependencies that threaten a milestone, ranked by how soon they bite.
3. For each at-risk one, a short chase message written from the other team's point of view: why it matters to them, the exact ask, the date, and an offer of help.
4. Dependencies that have no named contact or no agreed date, as questions to resolve this week.
5. What to escalate, to whom, and the point at which to do it.

Rules: use only my dates; write [DATE?] where none was agreed. Treat "assumed" dependencies as the riskiest. Never imply the other team is at fault.

Fill in: DEPENDENCY_LIST MILESTONE_LINKS OTHER_TEAM_CONTEXT

List both directions: what you need and what others need from you. Review it weekly with the other teams' leads, not only within your own team.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Supplier Performance Review Against the Contract

Best for: Running supplier reviews on evidence, not frustration

You are a project manager preparing for a supplier review meeting. Assess the supplier against what the contract actually says, not against general impressions.

Contracted deliverables, milestones, service levels and acceptance terms (paste the relevant schedule): {{CONTRACT_TERMS}}
What the supplier has actually delivered, with dates and evidence: {{SUPPLIER_DELIVERY}}
Open issues, disputes or concerns from the team: {{SUPPLIER_ISSUES}}

Produce:
1. A performance table: obligation | contract reference | due | delivered (date and evidence) | status (met, late, partial, not met, or not yet due) | impact on the project.
2. Patterns: whether problems point to capacity, quality, communication or unclear requirements on our side. Be honest where our late inputs or changing requests contributed.
3. An agenda for the review meeting, with the outcome wanted for each item.
4. Asks of the supplier, each specific and dated, and what we commit to in return.
5. Points to refer to the contract or commercial manager, such as service credits, remedies or change notes. Don't give a legal interpretation; just flag them.

Rules: rely only on the contract text and evidence I pasted. Where evidence is missing, mark it "unverified". Keep the tone factual, because this may be shared with the supplier.

Fill in: CONTRACT_TERMS SUPPLIER_DELIVERY SUPPLIER_ISSUES

Paste only the relevant contract schedule, with commercial figures removed if they aren't needed. Run it before every formal supplier review.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Status Reports & Stakeholder Updates

Status reporting is where projects lose credibility, usually by reporting Green until the week everything turns Red. The status prompt applies RAG rules strictly, so a slipping forecast can't hide. Other prompts write a one-page steering update, deliver news of a slipped milestone, adapt one update for three audiences, set up a communication plan, prepare you for a difficult stakeholder conversation and build a decision paper that's fair to every option.

Weekly Status Report With Honest RAG Ratings

Best for: Weekly reports where Green actually means on track

You are a project manager writing the weekly status report. It must be honest enough that nobody is surprised later.

This week's raw updates (from the team, the tracker or my notes): {{WEEKLY_UPDATES}}
Baseline: key milestones with dates, and budget if tracked: {{BASELINE}}
Our RAG definitions (if blank, use: Green = on track for baseline; Amber = at risk but recoverable within the team's authority; Red = will miss baseline or needs a decision above the project): {{RAG_RULES}}
Audience: {{REPORT_AUDIENCE}}

Write the report:
1. Overall status (RAG) with a one-sentence reason. Then a RAG for scope, schedule, budget and resourcing, each with a reason.
2. Done this week: up to five bullets, written as outcomes, not activity.
3. Next week: up to five bullets.
4. Milestones table: milestone | baseline date | forecast date | variance | RAG.
5. Top risks and issues (up to three), each with owner and action.
6. Decisions or help needed, with a date.

Rules: apply the RAG rules strictly. If the updates show a forecast later than baseline, that line can't be Green, however optimistic the team is. If something is missing, write [UPDATE NEEDED]. No filler like "great progress". Keep it under 350 words.

Fill in: WEEKLY_UPDATES BASELINE RAG_RULES REPORT_AUDIENCE

Paste raw updates rather than your own summary, so the AI can apply the RAG rules without your optimism. Use your organization's RAG definitions if it has them.

Run in ChatGPT Run in Claude Run in Gemini Prompt page
Example output · Claude (example written by The Prompt Index)
Sample inputs: WEEKLY_UPDATES = "Test load 2 of employee data failed on Tue: 312 duplicate employee IDs from the legacy system. Vendor fixing the de-dup script, ETA Wed 11 Nov, so test load done Fri 13 Nov at the earliest. Team feels we can still hit UAT if we compress prep. Payroll config 80% done. Payroll SME (Jen) on leave 9–20 Nov. Spend to date $212k, on plan. Training plan drafted." BASELINE = test load complete Fri 6 Nov; UAT start Mon 16 Nov; go-live Mon 1 Feb 2027; budget $540k, planned spend to date $215k. RAG_RULES = left blank (defaults used). REPORT_AUDIENCE = project board.

HR System Migration: status report, week ending Fri 30 Oct 2026

Overall: RED. The data migration test load will miss its baseline date of 6 Nov, and moving UAT needs a board decision.
- Scope: GREEN. No changes this week.
- Schedule: RED. The test load is forecast for 13 Nov against a baseline of 6 Nov, which puts the UAT start of 16 Nov at risk.
- Budget: GREEN. $212k spent against $215k planned.
- Resourcing: AMBER. The payroll SME is on leave 9–20 Nov, which overlaps UAT preparation and the start of UAT.

Done this week
- Root cause of the test load 2 failure found: 312 duplicate employee IDs in legacy data.
- Training plan drafted.

Next week
- Vendor delivers the de-duplication script fix (ETA Wed 11 Nov).
- Agree UAT payroll cover for 9–20 Nov.
- Payroll configuration: [UPDATE NEEDED: completion date for the remaining work].

Milestones
| Milestone | Baseline | Forecast | Variance | RAG |
|---|---|---|---|---|
| Test load complete | Fri 6 Nov | Fri 13 Nov | +5 working days | RED |
| UAT start | Mon 16 Nov | [UPDATE NEEDED] | Unknown | AMBER |
| Go-live | Mon 1 Feb 2027 | Mon 1 Feb 2027 | 0 | GREEN |

Top risks and issues
1. Issue: duplicate IDs in legacy data. Owner: vendor, with the data lead. Action: script fix and a re-run of the test load.
2. Risk: UAT starts without payroll SME cover. Owner: HR lead. Action: name a deputy by 6 Nov.
3. Risk: compressing UAT preparation reduces test coverage. Owner: test lead. Action: confirm the minimum preparation needed.

Decisions needed
- By Wed 4 Nov: the board decides whether to keep UAT at 16 Nov with compressed preparation, or move it to 23 Nov. The test lead's view of the minimum preparation is needed first.

Note on ratings: the team sees the schedule as recoverable, but a forecast later than baseline plus a decision above the project makes it Red under the RAG rules, not Amber.

One-Page Steering Committee Update

Best for: Ten-minute steering slots that end in decisions

Act as a program director preparing a one-page update for a steering committee that has ten minutes for this project.

Latest status report or notes: {{STATUS_DETAILS}}
Decisions or endorsements we need from the committee: {{DECISIONS_NEEDED}}
What this committee cares about most (benefits, cost, risk, reputation, regulation): {{COMMITTEE_PRIORITIES}}

Produce a one-page paper with:
1. Headline: one sentence a member could repeat accurately in a corridor.
2. Decisions requested, numbered, each with the recommended option and a deadline.
3. Status at a glance: overall RAG, then schedule, cost, scope and benefits, each with a reason of ten words or fewer.
4. What changed since the last meeting (up to four bullets).
5. Top three risks to the benefits, not just the schedule, with what the committee could do about each.
6. Appendix pointer: what detail is available on request.

Rules: lead with decisions, not activity. Leave out anything that appears in my notes only as speculation. Use only figures I gave you. Write for people who weren't in the project meetings: spell out acronyms and avoid team jargon.

Finish with three questions the committee is likely to ask, with short answers drawn from my notes.

Fill in: STATUS_DETAILS DECISIONS_NEEDED COMMITTEE_PRIORITIES

Feed it the latest status report plus the decisions you need. Send the paper ahead of the meeting, and spend the meeting on the decisions.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Tell Stakeholders a Milestone Will Slip

Best for: Delivering a delay without losing credibility

You are a project manager who has to tell stakeholders that a milestone will be late. Write the message so it keeps their trust.

The milestone, original date and new forecast date: {{SLIPPED_MILESTONE}}
Why it slipped (the honest cause, including our own part): {{ROOT_CAUSE}}
What we're doing about it and what has changed in the plan: {{RECOVERY_ACTIONS}}
Who is receiving it and their relationship to the project: {{RECIPIENTS}}

Write:
1. An email of 150–250 words that states the new date in the first two sentences. Then give the cause in plain words, without blaming individuals or vendors by name; the impact on these recipients specifically; the recovery actions; how confident we are in the new date; and what could still move it.
2. A version under 60 words for a chat message or the top of a status report.
3. Three likely pushback questions, with suggested answers.

Rules: don't hide responsibility in the passive voice ("mistakes were made"). Don't over-apologize. Never sound more certain about a date than my recovery actions support. If my inputs don't support a firm date, call it a "target" and state the condition it depends on. Use only facts I've given.

Fill in: SLIPPED_MILESTONE ROOT_CAUSE RECOVERY_ACTIONS RECIPIENTS

Send it as soon as you know, before stakeholders hear it elsewhere. Be honest in ROOT_CAUSE; the AI keeps it professional.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

One Update Rewritten for Three Audiences

Best for: Consistent messages for executives, the team and the client

Act as a communications-minded project manager. I have one set of facts and three audiences who each need something different.

This week's facts: {{UPDATE_FACTS}}
The audiences (for example executive sponsor, delivery team, client or end users) and what each cares about: {{AUDIENCES}}
Information some audiences must not see (commercial, HR or confidential): {{RESTRICTED_INFO}}

Write three versions:
1. Executive: up to 80 words. Outcome, status, any decision needed. No task detail.
2. Delivery team: up to 200 words. What changed, priorities for the week, blockers and who to go to, plus a thank-you that names specific work rather than generic praise.
3. Client or end users: up to 150 words. What it means for them, what they need to do, and when they'll hear next. Leave out internal problems unless they affect the client.

Rules:
- All three must agree: same dates, same status, and no version contradicting another.
- Never put restricted information in a version for an audience that shouldn't see it. After the three versions, list what you left out of each and why.
- Use only my facts. If an audience needs something I haven't provided, write [NEEDED: what].

Fill in: UPDATE_FACTS AUDIENCES RESTRICTED_INFO

Use when you're about to send the same update three times. Read the 'left out' list before sending; that's your confidentiality check.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Communication Plan Matrix

Best for: Deciding who hears what, when and through which channel

You are a project manager setting up the communication plan at the start of a project.

Project summary and duration: {{PROJECT_SUMMARY}}
Stakeholders or groups, and what they need from the project: {{STAKEHOLDER_NEEDS}}
Tools and channels available (email, chat, intranet, meetings, dashboards): {{CHANNELS}}
Existing governance meetings this project must report into: {{GOVERNANCE_MEETINGS}}

Produce:
1. A communication matrix: communication | purpose | audience | content | channel | frequency | owner | format or template. Cover at least kickoff, status reporting, steering papers, team stand-ups or check-ins, change notices, risk escalation, release or go-live notices, and closure.
2. An escalation path: who hears about a Red issue, in what order and how fast.
3. A noise check: any audience receiving more than three regular communications a week, with a suggestion to merge or cut.
4. Two feedback mechanisms to find out whether the communications are working.

Rules: use only the stakeholders and channels I listed. If something important seems missing, add it as a question at the end. Keep owners as roles, not names, unless I gave names. Prefer existing meetings and channels over creating new ones.

Fill in: PROJECT_SUMMARY STAKEHOLDER_NEEDS CHANNELS GOVERNANCE_MEETINGS

Pair it with the stakeholder map. Revisit after the first month; the noise check usually finds something to cut.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Prepare for a Difficult Stakeholder Conversation

Best for: Walking into a hard conversation with a plan

Act as a coach for project managers preparing for a tough conversation with a stakeholder.

The stakeholder's role and our working relationship: {{STAKEHOLDER_ROLE}}
The situation, and what they've said or done: {{SITUATION}}
What I need from the conversation: {{MY_OUTCOME}}
What I can and can't offer: {{NEGOTIABLES}}

Prepare me:
1. Their likely interests: what they might need underneath their position, labeled as hypotheses to test, not facts.
2. An opening of two or three sentences that names the issue without blame.
3. Questions to understand their view before I make my case.
4. My key message in one sentence, and the evidence for it from my notes.
5. Three likely objections, with a response to each that holds my position without sounding defensive.
6. What I'll offer, in what order, and where my limit is.
7. How to close: the specific agreement, the next step and the follow-up note.

Rules: no manipulation tactics or pressure scripts. Write the lines the way a person would actually say them. If my outcome looks unrealistic given what I can offer, tell me that before preparing the rest.

Fill in: STAKEHOLDER_ROLE SITUATION MY_OUTCOME NEGOTIABLES

Use before a conversation about scope, resources, a missed commitment or behavior that is hurting the project. Practice the opening out loud.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Steering Committee Decision Paper With Fair Options

Best for: Getting a committee to choose, with the trade-offs on the table

You are a program manager writing a decision paper. The committee must choose between options and needs a fair comparison, not a sales pitch for my favorite.

The decision to be made, and the deadline: {{DECISION_QUESTION}}
Options, including doing nothing, with what I know about each (cost, time, benefits, risks): {{OPTIONS_DATA}}
Criteria the committee uses or should use, with weightings if any: {{DECISION_CRITERIA}}

Produce:
1. Purpose: the decision in one sentence.
2. Background: no more than 100 words.
3. Options table: option | description | cost | time impact | benefits | risks | dependencies. Use my figures only; where one is missing write [ESTIMATE NEEDED].
4. Assessment against each criterion, with a short reason per cell and a note where the evidence is weak.
5. Recommendation and its key reason, plus what would have to be true for a different option to be better.
6. The consequences of delaying the decision.
7. Decision wording for the minutes, ready to approve.

Rules: describe every option fairly, including the strongest case for the ones I don't prefer. Don't invent scores or weightings. If I gave weightings, apply them and show the arithmetic.

Fill in: DECISION_QUESTION OPTIONS_DATA DECISION_CRITERIA

Use for go/no-go, supplier, build-versus-buy or funding decisions. If you have a lot of messy evidence to weigh first, work it through before drafting the paper.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Meetings, Minutes & Action Items

Meetings are where decisions get made and then forgotten. These prompts plan agendas around outcomes and turn raw notes or transcripts into minutes with real owners and dates. They build a decision log from scattered threads, write the follow-up email and summarize async stand-ups. One audits your recurring meetings and calculates the person-hours they cost. When the notes don't name an owner or a date, the output says so instead of making one up.

Meeting Agenda Built Around Outcomes

Best for: Agendas that lead to decisions instead of discussion

Act as a facilitator who runs short, useful project meetings.

Meeting purpose and the decisions or outputs it must produce: {{MEETING_PURPOSE}}
Attendees and what each brings: {{ATTENDEES}}
Length and format: {{MEETING_LENGTH}}
Pre-reads, or open items from the last meeting: {{OPEN_ITEMS}}

Produce:
1. A one-line objective in the form "By the end we will have…".
2. An agenda table: time | item | outcome type (decide, agree, inform or input) | lead | pre-work. The timings must add up to the meeting length, with five minutes kept for actions and close.
3. For every "decide" item, the question to be decided, worded so the answer is yes/no or a choice between named options.
4. Items that don't need a meeting and could go in a written update instead.
5. An invite message: purpose, agenda summary and what to prepare.

Rules: if the purpose doesn't need a meeting at all, say so and suggest an alternative. Use only my items and don't pad the agenda. If there's more content than time, prioritize and list what moves to the next meeting. Keep "inform" items to a minimum; information can be read beforehand.

Fill in: MEETING_PURPOSE ATTENDEES MEETING_LENGTH OPEN_ITEMS

Use for any meeting with more than four people or a decision to make. Send the invite text at least a day ahead.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Minutes and Action Items From Raw Notes

Best for: Turning scrappy notes into minutes with real owners

You are a project coordinator turning raw meeting notes or a transcript into clean minutes.

Raw notes or transcript: {{MEETING_NOTES}}
Meeting name, date and attendees: {{MEETING_DETAILS}}
Style (brief, standard, or formal for governance): {{MINUTES_STYLE}}

Produce:
1. Summary: three sentences on what this meeting achieved.
2. Decisions: numbered, each a complete sentence saying what was decided and by whom. Include only things that were actually decided, not things that were just discussed.
3. Action items table: # | action (starting with a verb) | owner | due date | source (a short quote or timestamp from the notes).
4. Open questions and parked items.
5. Risks or issues raised, for the RAID log.

Rules:
- Use only what's in the notes. Never invent an owner or a due date; write [OWNER?] or [DATE?] when one wasn't agreed.
- Where the notes are vague ("we should probably look at that"), list it under open questions, not as an action or decision.
- Attribute statements to people only when it matters for a decision or action.
- Leave out side chat and anything personal.

End with the three actions most likely to slip, and why.

Fill in: MEETING_NOTES MEETING_DETAILS MINUTES_STYLE

Paste notes or a transcript straight after the meeting. Chase the [OWNER?] and [DATE?] gaps before you circulate the minutes.

Run in ChatGPT Run in Claude Run in Gemini Prompt page
Example output · Claude (example written by The Prompt Index)
Sample inputs: MEETING_DETAILS = Website replatform, weekly delivery check-in, Tue 27 Oct 2026. Attendees: Priya (PM), Tom (dev lead), Aisha (content lead), Marco (agency account manager). MINUTES_STYLE = standard. MEETING_NOTES (pasted as typed):
"tom - staging build broken since fri, CDN config, agency fixing. marco says fix by thurs. content migration 340 of 610 pages done, aisha says redirects map not started, needs SEO input?? priya: go-live stays 30 nov for now, revisit next week if staging still down. agreed to drop the blog comments feature from launch, add after (marco ok, priya ok). aisha on leave 9-13 nov. someone needs to chase legal re cookie banner text. tom wants a code freeze date - discuss next week. marco to send revised invoice schedule. we should probably look at the search provider costs at some point"

1. Summary
The team reviewed the broken staging build, content migration progress and launch scope. Go-live stays at 30 Nov for now and will be revisited next week if staging is still down. Blog comments were removed from launch scope.

2. Decisions
1. Go-live remains 30 Nov 2026 for now. Priya will revisit it at next week's check-in if staging is still broken.
2. Blog comments are removed from the launch scope and will be added after go-live (agreed by Priya and Marco).

3. Action items
| # | Action | Owner | Due | Source |
|---|---|---|---|---|
| 1 | Fix the CDN configuration on the staging build | Agency (Marco) | Thu 29 Oct | "agency fixing. marco says fix by thurs" |
| 2 | Start the redirects map for migrated pages | Aisha | [DATE?] | "redirects map not started" |
| 3 | Chase legal for the cookie banner text | [OWNER?] | [DATE?] | "someone needs to chase legal" |
| 4 | Send the revised invoice schedule | Marco | [DATE?] | "marco to send revised invoice schedule" |

4. Open questions and parked items
- Does the redirects map need SEO input, and from whom? ("needs SEO input??")
- When is the code freeze? Tom asked for a date; it's on next week's agenda.
- Search provider costs: raised as "at some point", with no owner. Parked.

5. Risks and issues for the RAID log
- Issue: staging build down since Fri 23 Oct, blocking testing.
- Risk: the redirects map hasn't started, with 270 of 610 pages still to migrate and Aisha on leave 9–13 Nov. Migration or redirects could slip past 30 Nov.
- Dependency: legal sign-off on the cookie banner text before go-live.

Actions most likely to slip
1. #3 Chase legal: it has no owner, and "someone needs to" usually means no one does.
2. #2 Redirects map: there's no date, the SEO input question is unresolved, and the owner is away for a week in November.
3. #1 Staging fix: it's an external dependency, and go-live is being held on it.

Decision Log From Scattered Threads

Best for: Stopping settled decisions from being reopened

Act as a PMO analyst building a decision log. Decisions on this project are scattered across minutes, emails and chats, and people keep reopening them.

Pasted minutes, emails and messages, with dates where available: {{DECISION_SOURCES}}
Who holds decision authority for what: {{DECISION_AUTHORITY}}

Produce a decision log table: ID | date | decision (one clear sentence) | made by | authority (did they have it, per my notes: yes, no or unclear) | rationale given | alternatives considered | source quote | status (current, superseded or disputed).

Then:
1. Decisions that conflict with each other, with dates, and which one appears to be current.
2. Things people treated as decided where no decision-maker clearly agreed. List these as "assumed decisions" that need confirming.
3. Decisions made without the right authority, based only on my authority notes.
4. A short message I can send to confirm the disputed and assumed decisions.

Rules: log only what the sources show. Don't fill in a rationale that wasn't stated; write "not recorded". Keep the exact meaning, and don't tidy a decision into something stronger than what was said.

Fill in: DECISION_SOURCES DECISION_AUTHORITY

Run it when the same question keeps coming back, or when you inherit a project mid-flight. Keep the log and add to it after every governance meeting.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Post-Meeting Follow-Up Email

Best for: A follow-up email people can act on without the meeting

You are a project manager sending the follow-up after a meeting. People should be able to act on it without having attended.

Meeting summary, decisions and actions (from my notes or minutes): {{MEETING_OUTCOMES}}
Recipients, including anyone who missed the meeting: {{RECIPIENTS}}
Anything sensitive that shouldn't go in writing to this group: {{SENSITIVE_POINTS}}

Write the email:
1. Subject line: meeting name, date and the single most important outcome.
2. Opening: one sentence of context.
3. Decisions, as bullets.
4. Actions: a short list with owner and due date, with each owner's name in bold so people can find their own.
5. What happens next (the next meeting or milestone).
6. A line asking for corrections by a specific date, after which the notes stand.

Rules: keep the body under 200 words, not counting the action list. Use only what's in my notes. Where an owner or date is missing, write [TBC] and add it to a short "please confirm" line. Leave out the sensitive points, and after the email tell me what you removed. Neutral, friendly tone; no passive-aggressive phrasing like "as previously mentioned".

Fill in: MEETING_OUTCOMES RECIPIENTS SENSITIVE_POINTS

Send within a few hours of the meeting. The correction deadline turns the email into the agreed record.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Async Stand-Up Digest for a Distributed Team

Best for: Keeping a remote team aligned without a daily call

Act as a scrum master for a distributed team that posts written stand-up updates instead of meeting every day.

Today's raw updates from team members (pasted from chat): {{STANDUP_POSTS}}
Current sprint goal and key board items: {{SPRINT_GOAL}}
Blockers or dependencies carried over from earlier days: {{KNOWN_BLOCKERS}}

Produce a digest of up to 200 words:
1. Sprint goal status: on track, at risk or off track, with one line of evidence from the updates.
2. Blockers: who is blocked, who can unblock it, and since when. Mark blockers older than one day as AGING.
3. Hand-offs and collaboration needed between people today.
4. Work in progress that doesn't connect to the sprint goal, raised as a neutral question, not an accusation.
5. People who didn't post an update, listed without comment.

Rules: summarize only what people wrote. Don't judge individual productivity or compare team members. If an update is vague ("working on stuff"), list it under "needs detail" rather than guessing. The digest should be readable in under a minute.

Fill in: STANDUP_POSTS SPRINT_GOAL KNOWN_BLOCKERS

Paste the day's thread from your team channel. Post the digest back to the channel and chase the AGING blockers yourself.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Recurring Meeting Audit: Keep, Shrink or Cut

Best for: Winning back team time from recurring meetings

You are an operations-minded project manager auditing the team's recurring meetings, because the calendar has eaten the work.

Recurring meetings, with purpose, frequency, length, number of attendees and what each produces: {{MEETING_INVENTORY}}
Pain points the team has raised about meetings: {{TEAM_FEEDBACK}}
Meetings required by governance or a client contract: {{MANDATORY_MEETINGS}}

Do this:
1. Calculate person-hours per month for each meeting (length × attendees × occurrences per month) and in total. Show the working.
2. For each meeting, judge from my descriptions whether its main value is decisions, coordination, information sharing or relationship-building.
3. Recommend keep, shorten, reduce frequency, make async, merge or cancel, each with a one-line reason. Don't cut mandatory meetings; suggest how to make them shorter or sharper instead.
4. Show total person-hours per month before and after the recommendations.
5. Write a short message to the team announcing a four-week trial of the changes and how we'll review it.

Rules: use only my numbers. Keep at least one regular slot where the team talks together. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: MEETING_INVENTORY TEAM_FEEDBACK MANDATORY_MEETINGS

Pull the inventory from your calendar. Frame the result as a trial; people accept a four-week experiment more readily than a permanent cut.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Sprint Planning, Backlog & Retrospectives

For Scrum and other Agile teams: user stories with Given/When/Then acceptance criteria, story splitting by vertical slices, and a Definition of Ready and Done the team can actually check. There's capacity-adjusted sprint planning from your own velocity, plus backlog ordering with MoSCoW or WSJF. You also get retros matched to how the sprint went, a prompt that turns retro notes into two real experiments, and a release forecast given as a date range. Velocity is treated as a planning aid, never a target.

User Stories With Given/When/Then Acceptance Criteria

Best for: Turning a feature brief into testable, sprint-sized stories

Act as an experienced product owner writing user stories that a team can estimate and test.

Feature or epic description: {{FEATURE_BRIEF}}
User types, and what each is trying to do: {{USER_TYPES}}
Business rules, constraints and non-functional needs (security, performance, accessibility): {{BUSINESS_RULES}}

Produce:
1. User stories in the form "As a [user type], I want [capability], so that [benefit]", each small enough to finish in one sprint.
2. For each story, three to six acceptance criteria in Given/When/Then form, including at least one edge case or error path.
3. A short INVEST check for each story (independent, negotiable, valuable, estimable, small, testable), noting any criterion it fails.
4. Questions for stakeholders wherever the brief is ambiguous.
5. Non-functional requirements written as constraints that apply across stories, not as separate stories.

Rules: don't add capabilities my brief doesn't imply; put extra ideas under "possible later stories". Don't estimate story points; the team does that. Use the user types I gave, never a generic "user". Keep each story's benefit about the user's goal, not the system's.

Fill in: FEATURE_BRIEF USER_TYPES BUSINESS_RULES

Use before backlog refinement, then refine the stories with the team, not instead of them. The ambiguity questions go to the product owner or the stakeholders.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Split Oversized Stories Into Vertical Slices

Best for: Breaking big stories into slices that finish in a sprint

You are an agile coach helping a team split stories that are too big to finish in a sprint.

The oversized stories, with their acceptance criteria: {{LARGE_STORIES}}
Team context (sprint length, rough capacity, tech stack): {{TEAM_CONTEXT}}
What the team said makes these stories big or uncertain: {{SIZE_CONCERNS}}

For each story:
1. Name why it's big: several workflows, many business rules, data variations, interface variations, complexity, performance work, or unknowns that need a spike.
2. Propose a split into vertical slices, each delivering something a user could see and test. Don't split into horizontal layers like "front end" and "back end". Use whichever pattern fits: workflow steps, business-rule variations, happy path first, data types, create/read/update/delete operations, or deferring performance.
3. Write each new story with two to four acceptance criteria.
4. Pick the slice to build first, because it delivers value or reduces risk fastest.
5. If there's a big unknown, propose a time-boxed spike with the question it must answer.

Rules: every slice must be valuable and testable on its own. Don't estimate points. Don't drop any of the original acceptance criteria; show where each one went.

Fill in: LARGE_STORIES TEAM_CONTEXT SIZE_CONCERNS

Bring it to refinement when the team keeps rolling stories over. Check the mapping of the original acceptance criteria before you accept the split.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Definition of Ready and Done for Your Team

Best for: Agreeing what 'ready' and 'done' mean before arguing about them

Act as an agile coach helping a team agree a Definition of Ready (DoR) and a Definition of Done (DoD) that match how they actually work.

Team type and what it delivers: {{TEAM_DELIVERABLES}}
Current problems (stories arriving unclear, work "done" but not deployed, bugs found late): {{CURRENT_PROBLEMS}}
Organizational standards that must be included (security review, accessibility, documentation, release approval): {{ORG_STANDARDS}}

Produce:
1. A draft DoR: five to eight checkable statements a backlog item must meet before the team pulls it into a sprint.
2. A draft DoD: six to ten checkable statements, grouped into work quality, testing, documentation and release, including my organizational standards.
3. For each problem I listed, the statement that addresses it.
4. Statements the team probably can't meet yet, marked "aspirational", with a suggestion for phasing them in.
5. A 20-minute agenda for the team to review, edit and agree the drafts together.

Rules: every statement must be verifiable as yes or no, so avoid words like "good", "adequate" or "properly". Keep the DoR light, so it doesn't become a gate that stalls work. Don't add standards I didn't mention to the mandatory list; suggest them separately.

Fill in: TEAM_DELIVERABLES CURRENT_PROBLEMS ORG_STANDARDS

Treat the output as a starting draft for the team to own. Revisit the DoD at retros when quality problems recur.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Sprint Plan From Your Velocity and Capacity

Best for: A capacity-adjusted sprint forecast before planning starts

Act as a scrum master preparing for sprint planning. Use only the numbers I give you.

Completed points or items in each of the last three to six sprints: {{VELOCITY_HISTORY}}
Team availability this sprint (days off, part-time, new joiners) and sprint length: {{SPRINT_CAPACITY}}
Ordered backlog items, with estimates and dependencies: {{READY_BACKLOG}}
The product owner's proposed sprint goal: {{PROPOSED_GOAL}}

Do this:
1. Calculate the average and range of past velocity. Adjust for this sprint's availability by the ratio of available person-days to a normal sprint's person-days.
2. Propose a forecast range (low to high), not a single commitment.
3. Select backlog items in order up to the low end of the range, then list stretch items up to the high end. Respect dependencies.
4. Check whether the selected items actually achieve the sprint goal. If not, suggest a sharper goal or a different selection.
5. Flag items that aren't ready: no acceptance criteria, no estimate, or blocked.

Rules: velocity is a planning aid for this team only. Don't compare it with other teams or treat it as a target. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: VELOCITY_HISTORY SPRINT_CAPACITY READY_BACKLOG PROPOSED_GOAL

Run it before the planning meeting, and let the team change the selection in the room. The forecast range is for the product owner, not a promise.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Prioritize the Backlog With MoSCoW or WSJF

Best for: A backlog order you can defend to stakeholders

You are a product manager helping me prioritize a backlog transparently, so the order can be defended to stakeholders.

Backlog items, each with a short description: {{BACKLOG_ITEMS}}
Method to use (MoSCoW, WSJF or both): {{PRIORITIZATION_METHOD}}
Scores from the team and stakeholders (for WSJF: business value, time criticality, risk reduction and job size): {{TEAM_SCORES}}
Fixed constraints (deadlines, regulatory items, dependencies, capacity): {{FIXED_CONSTRAINTS}}

For MoSCoW: sort items into Must, Should, Could and Won't (this time), with a one-line reason each. Flag it if the Musts look like more than the team can deliver, using any capacity I gave.
For WSJF: calculate cost of delay = business value + time criticality + risk reduction, then WSJF = cost of delay ÷ job size. Rank the items and show a table with the arithmetic.

Then:
1. Items whose position looks wrong given the constraints (a regulatory item ranked low, say), and why.
2. Items whose scores seem inconsistent with their description, raised as questions.
3. A short note explaining the order to stakeholders.

Rules: never invent scores; list unscored items as "unscored". If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: BACKLOG_ITEMS PRIORITIZATION_METHOD TEAM_SCORES FIXED_CONSTRAINTS

Collect scores in a short session with stakeholders first. The point is a transparent order, so share the table, not just the ranking.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Retrospective Plan Matched to the Team's Mood

Best for: Retros that fit the sprint the team just had

Act as an agile coach designing the next retrospective. Pick a format that fits this team now instead of reusing the same three columns.

How the last sprint went (outcomes, incidents, mood): {{SPRINT_SUMMARY}}
Team size, remote or in person, and time available: {{RETRO_SETUP}}
Actions from the last retro, and whether they happened: {{PREVIOUS_ACTIONS}}
Anything sensitive I should know about (conflict, someone leaving, a failed release): {{SENSITIVITIES}}

Produce:
1. A recommended format (for example Start/Stop/Continue, 4Ls, Sailboat, Timeline, Mad/Sad/Glad, or a retro focused on one theme) and why it fits.
2. A timed plan through the five stages: set the stage, gather data, generate insights, decide what to do, close. It must fit my time exactly.
3. The opening check-in question and the exact prompts to put on the board.
4. How to review last retro's actions without it turning into blame.
5. Facilitation tips for the sensitivity I mentioned, including what to do if the conversation turns personal.
6. How the team will choose no more than two actions, each with an owner.

Rules: keep it safe to speak. No exercises that single out individuals.

Fill in: SPRINT_SUMMARY RETRO_SETUP PREVIOUS_ACTIONS SENSITIVITIES

Use when retros feel stale or after a rough sprint. If the sensitivity is serious, such as a conflict between two people, deal with it outside the retro first.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Retro Notes Into Themes and Two Experiments

Best for: Getting from sticky notes to changes that actually happen

You are a scrum master turning raw retrospective notes into a few actions the team will actually do.

Raw retro notes or sticky-note text: {{RETRO_NOTES}}
Votes or dot counts, if any: {{VOTE_COUNTS}}
Recurring themes from previous retros: {{PAST_THEMES}}

Produce:
1. Themes: group the notes into three to six themes, each with a neutral name, the notes that belong to it, and the vote total if given.
2. Repeat offenders: themes that also appeared in past retros, flagged RECURRING, with a question about why earlier actions didn't fix them.
3. Up to two experiments for the next sprint, each written as: "We believe [change] will result in [outcome]. We'll know it worked when [observable signal] by [date]." Include an owner role and the first step.
4. Problems outside the team's control, written as an escalation note for me to raise.
5. A three-line summary for the team channel.

Rules: use only the notes. Keep individuals' names out of the themes and the summary. Don't turn every note into an action; two experiments that happen beat ten that don't. If there are no votes, don't invent a ranking; say the team should vote.

Fill in: RETRO_NOTES VOTE_COUNTS PAST_THEMES

Paste the board export right after the retro. Put the experiments on the sprint board so they don't vanish.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Release Forecast as a Date Range, Not a Promise

Best for: Answering 'when will it be done?' honestly in Agile

Act as a delivery lead forecasting when a release could ship. The forecast must be an honest range built from the team's own data.

Remaining backlog for the release, in points or item counts: {{REMAINING_SCOPE}}
Completed points or items per sprint for the last several sprints: {{THROUGHPUT_HISTORY}}
Sprint length, next sprint start date and known holidays: {{SPRINT_CALENDAR}}
Scope typically added per sprint, if known: {{SCOPE_GROWTH}}

Do this:
1. From my history, take the lowest, median and highest sprint totals.
2. Calculate the number of sprints to finish at each rate, rounding up, and the matching end dates. If I gave scope growth, subtract it from each rate first and say so.
3. Present the forecast as "between [date] and [date], most likely around [date]", with the assumptions listed.
4. Describe what would move the forecast earlier or later, and what should trigger a re-forecast.
5. Write a short message to stakeholders explaining the range and why we don't give a single date.

Rules: use only my numbers, with no industry benchmarks. If a rate after scope growth is zero or negative, say the release won't converge at that rate and what must change. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: REMAINING_SCOPE THROUGHPUT_HISTORY SPRINT_CALENDAR SCOPE_GROWTH

Re-run it every sprint and share the trend. A range that narrows over time builds more trust than a fixed date that moves.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Change Requests & Scope Creep

Scope rarely explodes. It creeps, one small request at a time. These prompts assess a change request's impact from your team's estimates and audit recent requests against the baseline to find unapproved work. They also write the reply that says no, or not yet, without damaging the relationship. For governance, there's a change board summary that totals the cumulative hit on contingency, and a re-baseline proposal for when the plan no longer reflects reality.

Change Request Impact Assessment

Best for: A neutral impact assessment the change board can decide on

You are a project manager assessing a change request before it goes to the change control board. Assess the impact; don't approve or reject it.

The change request as submitted (what, why, who asked): {{CHANGE_REQUEST}}
Current baseline: the relevant scope, milestones, budget, contingency and resources: {{CURRENT_BASELINE}}
Effort or cost estimates from the people who would do the work: {{TEAM_ESTIMATES}}

Produce:
1. Summary: the change in one sentence and the reason given for it.
2. Impact table covering scope, schedule, cost, resources, quality, risk and benefits. For schedule and cost, use only my team's estimates and show how you get from them to the impact. Where there's no estimate, write [ESTIMATE NEEDED FROM: role].
3. Knock-on effects on other deliverables, dependencies, contracts or teams.
4. Options: implement now, implement later (a future phase or release), implement a reduced version, or decline, each with its trade-off.
5. Questions the board is likely to ask, with answers from my inputs.
6. A draft change log entry: ID, date, requester, description, impact summary, status "Pending decision".

Rules: never invent effort, cost or durations. Say whether the change affects the critical path only if my baseline shows it. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: CHANGE_REQUEST CURRENT_BASELINE TEAM_ESTIMATES

Get estimates from the people who'd do the work before running this. Attach the output to the change request for the board.

Run in ChatGPT Run in Claude Run in Gemini Prompt page
Example output · Claude (example written by The Prompt Index)
Sample inputs: CHANGE_REQUEST = CR-014, raised 26 Oct 2026 by the Head of Marketing: add Apple Wallet and Google Wallet passes for the loyalty card to Release 1, because "customers keep asking and competitors have it". CURRENT_BASELINE = loyalty app Release 1. Feature freeze Fri 5 Feb 2027, go-live Fri 12 Mar 2027. Critical path: mobile build → feature freeze → regression testing → go-live. Budget $480,000, spent $210,000, contingency $30,000 unallocated (the sponsor controls it). Two mobile developers are fully allocated until feature freeze. TEAM_ESTIMATES = mobile 15 developer-days, backend 8 days, QA 6 days, blended day rate $650. Mobile lead: "If this goes into R1 with the current two devs, feature freeze moves 2 weeks."

1. Summary
CR-014 adds wallet passes for the loyalty card to Release 1. The reason given is customer demand and competitor parity.

2. Impact
| Area | Impact |
|---|---|
| Scope | Adds one feature (wallet pass generation and updates) to Release 1. |
| Schedule | The mobile lead estimates feature freeze moves 2 weeks, from Fri 5 Feb to Fri 19 Feb 2027. Mobile build is on the baseline critical path, so go-live moves from Fri 12 Mar to Fri 26 Mar 2027 unless the time is recovered elsewhere. |
| Cost | (15 + 8 + 6) days = 29 days × $650 = $18,850. |
| Contingency | $30,000 − $18,850 = $11,150 left, so this one change would use most of the contingency. |
| Resources | The two mobile developers are fully allocated, so this extends their work rather than filling spare capacity. |
| Quality | Regression testing will have to cover wallet passes. [ESTIMATE NEEDED FROM: QA lead, on whether 6 days includes regression or only feature testing.] |
| Risk | Wallet passes depend on Apple and Google developer account setup and approval. No lead time is given. [ESTIMATE NEEDED FROM: mobile lead] |
| Benefits | No benefit estimate was supplied. "Customers keep asking" needs evidence, such as a count of support tickets or survey responses. |

3. Knock-on effects
- A later go-live affects anything planned around 12 Mar, such as a marketing launch. I don't know of any, so check.
- Backend work (8 days) may compete with other Release 1 backend items. This isn't shown in the baseline, so check.

4. Options
- Implement now (Release 1): delivers the feature at launch, but costs about 2 weeks on go-live and $18,850 of contingency.
- Implement later (Release 1.1): protects the 12 Mar date. Cost is likely similar, but needs re-estimating against the 1.1 plan.
- Reduced version: a static wallet pass with no live points balance. [ESTIMATE NEEDED FROM: mobile and backend leads]
- Decline: no cost, but the competitor-parity gap stays open.

5. Likely board questions
- "Can we keep 12 Mar?" Not by adding this to Release 1 with the current team, according to the mobile lead's estimate.
- "What's left for other risks?" $11,150 of contingency if this is approved.
- "Who benefits, and how do we know?" There's no evidence in the request yet.

6. Draft change log entry
CR-014 | 26 Oct 2026 | Head of Marketing | Add Apple/Google Wallet loyalty passes to Release 1 | Impact: +2 weeks to go-live (12 Mar → 26 Mar 2027), $18,850 from contingency, approval lead time unknown | Status: Pending decision

Spot Scope Creep in Recent Requests

Best for: Catching unapproved work before it blows the budget

Act as a project manager checking whether scope has been creeping without anyone noticing.

Approved scope statement or requirements baseline: {{SCOPE_BASELINE}}
Requests, tickets, emails and "small asks" from the last few weeks: {{RECENT_REQUESTS}}
Change requests approved so far: {{APPROVED_CHANGES}}

Do this:
1. Compare each request with the baseline and the approved changes. Classify it as in scope, a clarification of existing scope, out of scope (new work), or gold-plating (extras the team added that nobody asked for).
2. Show a table: request | who asked | date | classification | baseline reference or "none" | status (done, in progress or not started).
3. Highlight out-of-scope work already done or in progress without an approved change, because that is the real exposure.
4. Group the out-of-scope items into themes that reveal a pattern, such as one stakeholder or one area of the product.
5. Recommend how to handle each: raise a change request, bundle it into the next phase, decline politely, or accept it as a clarification.

Rules: base every classification on the baseline text and quote the line you relied on. If the baseline is too vague to judge, say "baseline unclear" and suggest tighter wording. Don't estimate effort; mark the items that need sizing.

Fill in: SCOPE_BASELINE RECENT_REQUESTS APPROVED_CHANGES

Run it monthly, or whenever the team feels busier than the plan says it should be. Raise the findings with the sponsor, not with the individual requesters one by one.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Say No, or Not Yet, to an Out-of-Scope Request

Best for: Protecting scope without damaging the relationship

You are a project manager replying to a stakeholder who has asked for something outside the agreed scope. The aim is to protect the project and the relationship.

The request, and who made it: {{OUT_OF_SCOPE_REQUEST}}
Why it's out of scope (the baseline reference) and what it would affect: {{SCOPE_REFERENCE}}
Options I can offer (a change request, a later phase, a swap for something of similar size, a smaller version): {{OFFERABLE_OPTIONS}}
My relationship with this person, and their seniority: {{RELATIONSHIP}}

Write:
1. A reply of 120–200 words. Acknowledge the value of the idea, say clearly that it isn't in the current scope, explain the impact of adding it in concrete terms from my inputs, offer the options, and ask them to choose by a date.
2. A spoken version for a call, in five or six sentences.
3. A calm response for if they push back by pointing to their seniority, which routes the decision to the right authority, such as the sponsor or the change board.

Rules: no contract jargon unless I say this person uses it. Don't promise anything outside my options. Don't apologize for having a scope. Keep it warm and direct.

Fill in: OUT_OF_SCOPE_REQUEST SCOPE_REFERENCE OFFERABLE_OPTIONS RELATIONSHIP

Reply the same day; a slow reply looks like a yes. If the request is genuinely valuable, the change request route is the answer, not a flat no.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Change Control Board Summary With Cumulative Impact

Best for: Board papers that show the combined cost of 'small' changes

Act as the change manager preparing the summary for this week's change control board.

Change requests awaiting a decision, with their impact assessments: {{PENDING_CHANGES}}
Remaining contingency (budget and schedule), and who controls it: {{CONTINGENCY}}
Board members and their decision limits: {{BOARD_AUTHORITY}}

Produce:
1. A summary table: CR ID | title | requester | impact on cost, schedule and scope | recommendation (approve, approve with conditions, defer, reject, or more information needed) | reason.
2. Cumulative impact: what happens to contingency and the baseline if every recommended approval goes through, with the arithmetic shown. Flag it if contingency would go negative.
3. Changes that exceed the board's authority and must go to the sponsor or steering group.
4. Dependencies between change requests, where approving one forces or rules out another.
5. Decision wording for each request, ready for the minutes.

Rules: use only the figures in my inputs. If an impact assessment is incomplete, recommend "more information needed" and say exactly what's missing. Don't recommend approval just because a change is small; check the cumulative effect. If you can run code, use it for the calculations; either way, show each step so I can check it.

Fill in: PENDING_CHANGES CONTINGENCY BOARD_AUTHORITY

Feed it the impact assessments from the prompt above. The cumulative contingency check is the part boards most often skip.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Re-Baseline Proposal After Major Change

Best for: Resetting the baseline openly instead of reporting permanent red

You are a project manager proposing a formal re-baseline, because the current plan no longer reflects reality.

Original baseline (scope, key dates, budget): {{ORIGINAL_BASELINE}}
What has changed and why (approved changes, external events, revised estimates): {{CHANGE_HISTORY}}
Proposed new scope, dates and budget from the team's re-planning: {{PROPOSED_BASELINE}}

Write a re-baseline proposal of no more than 600 words with:
1. Why we need to re-baseline rather than keep reporting variance, in plain language.
2. A comparison table: item | original baseline | proposed | difference | cause.
3. What we learned about our estimates or assumptions that should change how we plan from here.
4. Confidence in the new baseline, and the main risks to it.
5. The effect on benefits and the business case: does it still stand? If my inputs don't show this, name the figure that needs checking.
6. The decision requested, and from whom.

Rules: use only my figures, and show how each difference is calculated. Don't present a delay as a scope change, or a scope change as a delay. If the proposed baseline doesn't look supported by the change history, point that out rather than smoothing it over.

Fill in: ORIGINAL_BASELINE CHANGE_HISTORY PROPOSED_BASELINE

Use when variance reports have stopped meaning anything because the baseline is fiction. Get the business case owner to check section 5 before it goes up.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Lessons Learned, Closure & Handover

Closing well is what makes the next project easier. These prompts plan a blameless lessons-learned workshop and turn its output into a register of 'When X, do Y' rules tied to a template or process change. They also write a closure report that says 'not measured' when something wasn't, and hand over to operations with a checklist, acceptance criteria and hypercare exit criteria.

Blameless Lessons Learned Workshop

Best for: A lessons session people speak honestly in

Act as an independent facilitator planning a lessons-learned session at the end of a project or phase.

Project summary, and the outcome compared with the original objectives: {{PROJECT_OUTCOME}}
Key events and turning points, good and bad: {{KEY_EVENTS}}
Attendees and time available: {{WORKSHOP_SETUP}}

Produce:
1. A timed agenda that fits my time, built around a timeline exercise: participants place events on a timeline, then discuss what helped and what hindered.
2. Ground rules that keep it blameless: focus on systems, decisions and the information available at the time, not on individuals.
3. Questions for each area (planning, estimating, requirements, stakeholders, suppliers, team, governance and handover) that draw out specific examples rather than opinions.
4. A five-question pre-survey so quieter people can contribute in advance.
5. A plan for turning insights into lessons someone will use: who receives each lesson and where it is stored.

Rules: use only the events I gave you to prime the timeline; don't invent incidents. Avoid questions that start with "who" when asking about problems. Make sure what went well gets as much time as what went wrong.

Fill in: PROJECT_OUTCOME KEY_EVENTS WORKSHOP_SETUP

Hold it within two weeks of go-live or phase end, while memories are fresh. Run the pre-survey first; it often surfaces the most candid input.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Lessons Learned Register That Changes the Next Project

Best for: Lessons logs that change templates, not just fill a folder

You are a PMO lead turning raw lessons-learned notes into a register that future projects will use. Most lessons logs are never read, so make every entry actionable.

Raw notes from the lessons session, retros and surveys: {{LESSONS_NOTES}}
Project type and organizational context: {{PROJECT_CONTEXT}}
Where lessons are stored and who reviews them: {{LESSONS_PROCESS}}

For each lesson, write an entry: ID | category (planning, estimating, scope, stakeholders, suppliers, team, governance, technical, handover) | what happened (fact) | effect on the project | root cause | lesson, written as a rule others can follow ("When X, do Y") | recommended change to a template, checklist or process | owner of that change | which future projects it applies to.

Then:
1. Mark the top five lessons by likely value to future projects, with a reason for each.
2. Separate "did well, repeat" from "change next time". Both matter.
3. List notes that are complaints without a lesson, and either turn each one into a lesson or drop it, saying which.
4. Draft a 100-word summary for the PMO newsletter or portfolio review.

Rules: use only the notes. Keep individuals' names out. Don't turn one incident into a universal rule; mark single-instance lessons "single case".

Fill in: LESSONS_NOTES PROJECT_CONTEXT LESSONS_PROCESS

Run it on the workshop output. The 'change to a template or process' column is what makes a lesson stick; assign its owner before closing the project.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Project Closure Report for the Sponsor

Best for: An honest closure report the sponsor can sign

Act as a project manager writing the closure report for the sponsor and the PMO.

Original objectives, scope and baseline: {{ORIGINAL_PLAN}}
Final results: what was delivered, with dates, cost and quality: {{FINAL_RESULTS}}
Benefits measured so far, and those still to be measured: {{BENEFITS_STATUS}}
Items still open at closure (defects, actions, risks, contracts): {{OPEN_ITEMS}}

Write the report with these sections:
1. Executive summary of no more than 120 words.
2. Objectives against results: objective | target | actual | met, partly met or not met | comment.
3. Scope delivered, deferred and descoped, with the reason for each change.
4. Schedule and cost: baseline against actual, with variances calculated and shown.
5. Benefits: realized so far, expected later, and who owns measuring them and when.
6. Handover status and open items, each with an owner.
7. Top lessons (up to five), each pointing to the lessons register.
8. Formal closure request: what the sponsor is asked to sign off.

Rules: use only my figures and don't round them in our favor. If a result wasn't measured, say "not measured", never "achieved". If a benefit target wasn't met, say so plainly in the summary.

Fill in: ORIGINAL_PLAN FINAL_RESULTS BENEFITS_STATUS OPEN_ITEMS

Write it before the team disperses so open items get real owners. Attach the lessons register and the handover checklist.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

Handover to Operations and Hypercare Plan

Best for: Handing over to operations so the project can actually close

You are a service transition lead making sure the project hands over cleanly to the team that will run what we built.

What the project delivered (system, process, product or service): {{DELIVERABLE}}
The receiving operations or business-as-usual team, and their current capacity: {{RECEIVING_TEAM}}
Support arrangements agreed so far (warranty period, hypercare, supplier support): {{SUPPORT_AGREEMENTS}}

Produce:
1. A handover checklist grouped as: documentation, knowledge transfer and training, access and accounts, support model and escalation, monitoring and service levels, open defects and known issues, contracts and licenses, budget transfer, and benefits tracking. Each item has: item | evidence needed to tick it off | project owner | receiving owner | status [OPEN].
2. Acceptance criteria the receiving team signs: what must be true for them to accept the handover.
3. A hypercare plan: duration (from my inputs, or [DURATION TBD]), who's on call, and exit criteria.
4. The top five handover risks for this kind of deliverable, with a check for each.

Rules: don't assume the receiving team has capacity or skills I haven't mentioned; list gaps as questions. Don't mark anything complete. Keep items specific to my deliverable rather than a generic IT list, unless the deliverable is an IT system.

Fill in: DELIVERABLE RECEIVING_TEAM SUPPORT_AGREEMENTS

Start this a month before go-live, not in the last week. Agree the hypercare exit criteria with the receiving team up front.

Run in ChatGPT Run in Claude Run in Gemini Prompt page

How to get the best results

  1. Start from the job in front of you. Pick the section that matches it (a charter, a slipping milestone, a retro, a change request) and copy that prompt.
  2. Paste your real material into the {{VARIABLES}}. Use the raw notes, the transcript, the team's estimates and the baseline dates, not your summary of them. Remove client names, salaries, commercial terms and anything else confidential that the task doesn't need, and use an AI tool your organization has approved for project data.
  3. Run it in ChatGPT, Claude or Gemini, then refine with one instruction at a time ("shorter", "for the client, not the board", "split item 3").
  4. Check the brackets and the math. Every [OWNER?], [DATE?] and [ESTIMATE NEEDED] is a question you need to answer before the document goes out. The calculation prompts show their working; spot-check it, or ask the AI to run the numbers in code if it can.
  5. Keep the judgment calls human. RAG ratings, risk scores and change recommendations are drafts for you and your team to confirm, not decisions.

Tip: chain the prompts. The WBS feeds the PERT estimates, minutes feed the RAID log, the change impact assessment feeds the change board summary, and the lessons workshop feeds the lessons register. For a big go/no-go call where you have a pile of evidence to weigh, Decision Lab (Basic and Pro) turns it into a decision brief you can attach to the steering paper.

Take the whole pack with you

Download all 50 prompts as a tidy PDF, or as Markdown you can paste straight into Notion. It needs a free account: no card, and the prompts above stay free to copy either way.

Sign up free to download

Frequently asked questions

Can ChatGPT build a project plan or schedule for me?

It can structure one, but it can't know how long your work takes. Use the WBS prompt to break scope into work packages, collect estimates from the people doing the work, and then use the PERT and critical path prompts to combine those estimates and find the path that drives the end date. Those prompts use only your numbers and show each calculation, so you can check them before the plan goes to anyone.

Do these prompts work for Agile and Scrum as well as Waterfall?

Yes. The Agile section covers user stories, story splitting, Definition of Ready and Done, sprint planning from your own velocity, backlog prioritization, retrospectives and release forecasts given as a date range. The Waterfall side covers charters, stage-gate milestone plans, critical path, earned value and formal change control. Most of the status, risk, meeting and closure prompts work in either approach, and the charter prompt adjusts if you say the project is Agile.

Is it safe to paste project notes into ChatGPT, Claude or Gemini?

Follow your organization's AI policy first. Many companies allow approved business versions of these tools and restrict personal accounts. Either way, strip out what the task doesn't need: client names, personal details, salaries, contract values and anything marked confidential. The prompts work just as well with "Client A" and role titles instead of names.

Which prompts should a new project manager start with?

Start with the ones that save time every week: minutes and action items from raw notes, the weekly status report with honest RAG ratings, and the RAID log from meeting notes. Then add the scope statement and change request impact assessment, because scope creep is where new PMs most often get caught out.

Can AI replace a project management tool like Jira, Asana or MS Project?

No. These prompts produce documents and analysis, while your PM tool holds the live plan, tasks and history. The prompts work alongside it: export a task list, a backlog or a sprint report as text, paste it in, and paste the results back into your tool or report.